Different Project Types
The first thing you start with when you want to start working with Project is to define the different project types you will be working with.
You can have several different project types, but define them according to the resources needed.
Projects with similar resource requirements can be defined as one project type. Take the time to prepare some functional project types and record them in the list of project types.
The next step is to build data needed for projects in Manage. When some of these are relevant for a project type, tag them to this project type. We call the sum of all the resources marked on a specific project type a "Project type template". Later, the resources can be copied into a new project of this type.
Manage project types: https://youtu.be/vTGMYpviLYk
You can find the contents of each project type template by clicking on a project type (not edit mode, view only). Each resource will appear in each tab:
Predefined storage location for template documents
When creating a project room, it is possible to pre-define the path to where completed template documents (other than the local project archive) will be stored, such as a Teams channel, another SharePoint list, or a folder on a server. Enter the URL in the setup as shown below before creating a project space:
Folders
The folder template is defined in the Project Type element, either when you create or edit the element. Use bar character "|" to separate folders and levels. Here is an example:
Start page for process map
The process map start page for any project type is selected from the drop-down menu while editing a project type in Manage. This will be the top-level process map that users can access while working in the Project Room, provided no boxes are linked to any drawings/process maps at a higher level.
Risk templates
Risks can be tagged on project types when you edit a risk. See chapter on risks for details on how to create and edit risks. There are two approaches:
Risk is already defined
If you have risks that are already defined and only need to be tagged on one or another project type: find the risk, edit it and tag the relevant project type and save
2. Risk is not defined
The other option is to create a new risk within a project type:
Click on the project type (don't edit - just view)
Select the Risk tab
Add new - create new risk. This new risk is pre-populated with the current project type, but of course you can add more.
Targets templates
Adding targets to project type templates can be done in two ways.
When the target already exists
When the target already exists, edit the relevant target and mark the required project type(s) and save.
2. The target does not exist - needs a new target
If the target does not exist, create a new one from the target list and check Project type(s), or create a new from the Project type view:
Click on the project type (don't edit - just view)
Select the Target tab
Add new item - create new item. This new target is pre-populated with the current project type, but of course you can add more.
Requirements
The requirements for projects are managed in the detailed list. Requirements for project type templates can be created in two ways.
If the requirement already exists
When a requirement already exists, edit the relevant requirement, and mark the required project type(s) and save.
2. A new requirement is required
If the requirement does not exist, create a new one from the list of detailed requirements and check Project Type(s), or create a new requirement from the Project Type view:
Click on the project type (don't edit - just view)
Select the Requirements tab
Add new item - create new requirement. This new element is pre-populated with the current project type, but of course you can add more.